Email Us

CLGR® Welded Steel Chain Swivel WBS Type for Trawling Gear

CLGR® Welded Steel Chain Swivel WBS Type, also called mooring swivel and trawling swivel.


This Chain Swivel is made of super carbon steel, been welded and powder coated. It ideal for highly corrosive marine environments, so it usable for fishing or rigging applications.


This product is a positioning device and is not intended to swivel or rotate under load. Ultimate load is 5 times the Working Load Limit.


We offer 8mm, 10mm, 12mm, 14mm, 16mm, 19mm sizes, also customize the size according to customer requirements.

To Get A Quote >
20 CLGR® Welded Steel Chain Swivel WBS Type for Trawling Gear
20 CLGR® Welded Steel Chain Swivel WBS Type for Trawling Gear

Overview of CLGR® Welded Steel Chain Swivel WBS Type for Trawling Gear

BrandCLGR®

Size

8mm, 10mm, 12mm, 14mm, 16mm, 19mm

Type

WBS Type

WLL

5:1

Material

Super Carbon Steel

Finish

Powder Coated

Processing

Welded


Specifications of CLGR® Welded Steel Chain Swivel WBS Type for Trawling Gear

clgr-welded-steel-chain-swivel-wbs-type

Part No.

Weight (kg)

WLL/t

BL/t

A

(mm)

B

(mm)

C

(mm)

D

(mm)

E

(mm)

Φ

(mm)

CR-WBS-08

0.08

0.5

2.5

20

13

12

12

80

8

CR-WBS-10

0.23

0.6

3.0

32

25

25

31

123

10

CR-WBS-12

0.40

1.1

5.5

35

30

28

33

140

12

CR-WBS-14

0.65

1.3

6.5

40

38

33

37

168

14

CR-WBS-16

0.76

1.5

7.5

40

38

33

41

180

16

CR-WBS-19

1.30

2.4

12

50

38

35

47

200

19


Products
CLGR® Are Expecting Your Inquiry!
We design, manufacture and distribute products and provide services for lifting and material handling applications, the construction metal industry, the trawl industry and the yacht accessories industry.
Upload Files
Eye Bolt Load Capacity: Complete Guide to Working Load Limits and Lifting Selection
Eye Bolt Load Capacity: Complete Guide to Working Load Limits and Lifting Selection
When selecting lifting hardware for industrial applications, understanding eye bolt load capacity is essential for safe and efficient load handling. Eye bolts are widely used as connection points in c...
Types of Shackles for Lifting: Complete Guide to Selection and Applications
Types of Shackles for Lifting: Complete Guide to Selection and Applications
When selecting lifting and rigging equipment, understanding the types of shackles for lifting is essential for safe and efficient material handling. Shackles are critical connection components used be...
Fishing Slings: A Practical Guide to Safer, More Efficient Fish Handling
Fishing Slings: A Practical Guide to Safer, More Efficient Fish Handling
Fishing slings have become an essential tool for modern anglers who prioritize fish safety, accurate weighing, and efficient handling.According to industry data, the global recreational fishing equipm...
Fishing Hook Guide: Types, Sizes, Materials, and How to Choose the Right Hook
Fishing Hook Guide: Types, Sizes, Materials, and How to Choose the Right Hook
Fishing hooks are one of the most critical components in modern angling, directly affecting hook-up ratio, fish retention, and overall fishing efficiency. Whether targeting freshwater bass, offshore t...
+86-15866883493 sales@clgrindustrial.com
Office Address: Room808,Dexin Building,No.788 Lanao Road,Jimo District,Qingdao,266200.China.
We use cookies to offer you a better browsing experience, analyze site traffic and personalize content. Part of the tracking is necessary to ensure SEO effectiveness,
By using this site, you agree to our use of cookies. Visit our cookie policy to learn more.
Reject Accept